Crystal Lake Park |
||||||||||||||||||||||||||||||||||||||||||
|
Home | Calendar | City Officials | Meeting Minutes | Municipal Codes | Planning & Zoning | Ordinances | Newsletter | Comprehensive Plan | Useful Links | Fraud Policy |
Emergency: Call 911 |
||||||||||||||||||||||||||||||||||||||||||
|
City
Clerk P.O. Box 31338 St. Louis, MO 63131 (314) 993-1160 |
Planning & Zoning (P&Z)
Commission
|
||||||||||||||||||||||||||||||||||||||||||
| Name and Role | Term Exp |
| Rita Brinkmann, Chair | Oct 2010 |
| Maryanne Stewart, Vice Chair | Oct 2011 |
| Dennis Bauer | Oct 2011 |
| Phillip Bryant (non-voting) | Oct 2012 |
| David Evans* | Oct TBD |
| Jim Gehringer* | Oct TBD |
| Kevin Holland | Oct 2012 |
| Barry Larson | Oct 2010 |
| Cecelia Rowland | Oct 2012 |
|
*Re-appointed by the Mayor--Board of Alderpersons Mtg. Nov 2009 |
|
List of requirements for construction document submittal.
Minimum of five (5) complete sets of drawings delivered
to the City
Planner no less than ten (10) calendar days prior to
the Review Meeting.
Architecturally drafted on no less than 24”x18”
paper.
|
|
|
|
|
|
|
|
|
Site Plan: 1/8” = 1’-0” (minimum)
Showing, but not limited to,
|
|
|
|
|
|
|
Floor Plans: 1/4” = 1-0” (minimum)
Showing, but not limited to, all floors, levels and basement per St. Louis County requirements.
Elevations: 1/4" = 1’-0” (minimum)
Showing, but not limited to, all sides of the new construction where it relates to any existing structures and property lines, all vertical dimensions with reference to finished grade, line of new grade against exterior walls.
There must be reference of new grade and vertical dimensions as they relate to the existing concrete curb line in the font of the property.
Wall Section:
Showing, but not limited to, detailed section through typical exterior wall construction per St. Louis County requirements.
Samples:
Submit all exterior finishing material, including but not limited to, roof shingle type & color, siding type & color, brick or stone type & color, trim colors, paint colors, and various accessories (shutters, gable vents, retaining wall material, etc.).
Meeting Dates and Times:
In the past, the P&Z Commission and ARB met regularly on the second Thursday of the month. At present, the Commission/Board will only meet when there are plans to review. The Communications Coordinator will post announcements and Agendas on-line, on the community bulletin board, and by community e-mail when a meeting is scheduled. The Board of Adjustment has also been scheduled to meet on the first Thursday of the month; however, there will be no need to meet until there is a request for a Variance from our current building codes. Meeting information will be similarly posted.
Questions:
Any questions on submittal content, meeting dates and times please call or e-mail City Clerk, Cathryn Terrell, 993-1160. For City Code requirements, please direct questions to Neil Cantwell, Building Inspector, 968-1410 ext. 313. Please contact CLP's Planner Ada Hood for specifics about design.
National Poison
Control Center
1-800-222-1222
--------------------
Non-Emergency call
Frontenac
Police
314-994-9300
--------------------
| Useful Links |